Date | Time | Location | Equipment |
20/11/11 | 11am-3pm | Warehouse | Reg Cam, Tripod |
27/11/11 | 11am-3pm | Warehouse | SLR, Tripod |
11/12/11 | 10am-3pm | Warehouse | Canon HD, Tripod |
15/01/12 | 12pm-3pm | Warehouse | Sony HD, Tripod |
This shows my filming schedule for my music video. On the 20th, I plan to film my Test Shoot which will give me a feel for what it will be like for the real thing. The 27th is the day in which I will begin my real filming at my Warehouse location and hopefully capture the majority of my footage there. On the 4th, I plan to carry on my filming and hopefully by this time I will have captured all of my footage so I am able to upload it and start editing it.
Update (04/12/11): My actress was unable to film on the 4th, so filming was rescheduled to the 11th.
Update (09/01/12): I have also scheduled to film on the 15th with my actor which should be the last day of filming.
Update (04/12/11): My actress was unable to film on the 4th, so filming was rescheduled to the 11th.
Update (09/01/12): I have also scheduled to film on the 15th with my actor which should be the last day of filming.
By Harry Luke Mulvany
No comments:
Post a Comment